
Voltaq/How it works
From “what do we do now?” to a signed deal.
Four steps for you. The detail, the chasing and the small print are our job.
Four steps, about two days.
You spend about twenty minutes. We do the rest.
0120 minutesTell us what you run
What you run and what you spend. A short form or a call.
02Same dayWe ask the market
Your needs go to 3 to 5 vetted providers.
0348 hoursYou get one page
Price, availability, terms and the catches, side by side.
04AfterYou pick, we stay
We help you sign, and we stay on call.
What actually happens after you write in.
You deal with one person the whole way. Here is the work behind the four steps.
- We write down the requirementGPU type and count, network, storage, region, start date, term, budget and what you run.
- We request quotesThe same written requirement goes to 3 to 5 providers.
- We compareQuotes go side by side per GPU-hour, against a public price benchmark checked that week.
- We help you negotiatePrice, prepayment, start date, service credits, and your rights to exit.
- ChecksBasic know-your-customer checks, so nobody is put into a deal that US export rules would block.
- You sign with the providerYour contract is with the provider you choose. Voltaq refers; it does not resell.
- Test, then payFor a cluster, billing should start when the hardware is accepted as working, not when you sign.
- We stay reachableThrough onboarding, and for renewals, bills and outages if you use the ongoing desk.
One page you can forward as it is.
Written for a co-founder or an investor, not for a procurement team.

Credits-exit plan
Your workload · GPU type and count · region · start · term
| Opt. | Price / GPU-hr | Availability | Term | The catch | Our fee |
|---|---|---|---|---|---|
| A | Listed only | On demand | Storage bills while stopped | ||
| B | In writing | Monthly | Data egress is billed | ||
| C | In writing | 3 months | Prepayment asked |
Two days, in writing
Option B
Acceptance test
What the one-page plan contains.
No invented savings. If a saving is shown, it is the difference between written quotes, or between a written quote and a dated public list price, with the sources shown.
- Your requirementIn four or five lines.
- Three or more options, side by sideGPU type and count, network, region, rate, term, availability, prepayment and the catches.
- A benchmark lineThat week's public list range, with its source and date.
- Our fee, on the same pageSome providers pay Voltaq a referral fee if you sign with them; we list it next to each quote.
- What we'd pick, and what we wouldn'tIn plain English, with the reasons.
- What happens nextIncluding that you can walk away.

“Tested before you pay” is a written step, not a slogan.
IllustrationThe acceptance test.
We agree this checklist with you and the provider before the term starts, and adapt it to how the provider gives access.
Voltaq does not run a testing lab. We insist on the test and on billing starting at acceptance, and we sit with you on the call.
- InventoryGPU model, count, memory and driver versions, as actually delivered, not as advertised.
- ConnectivityLinks inside and between nodes, with a simple bandwidth test.
- A short, agreed compute testA stress test, and a small job that resembles your workload.
- StorageRead and write speed, and a note on the rules for moving data out.
- Failure and swapHow a bad GPU is replaced, and whether billing pauses while it is.
- Written sign-offThe date and time acceptance is given, which is when billing may start.
- Support pathWho is on call during the first 48 hours of the run.
See what your credits-exit plan looks like.
Free for startups. No obligation to pick any option.